Contact Us  |  02 9170 7818   
  • construction
  • refurbishment
  • interiors

Vernon Heritage Buildings A - D

Client
Sydney Olympic Park Authority (SOPA)

Location
Sydney Olympic Park, NSW

Architect
Mark Bullen Architects

Contract
Lump Sum

Description
Refurbishment and Maintenance Works to existing Heritage Buildings including replacement of roof drainage, installation of glass balustrading for compliance, installation of 3 new Access Ramps for compliance (both steel and concrete). Repair works to Heritage Entry Doors, tiling works etc. All tenants remained in occupation during the works.

Citation Certification ISO9001 ISO14001 ISO45001jasanz